新疆錾高水电站大流量压力前池甩负荷水力特性试验  

Hydraulic Characteristics Test of the Large-Flow-Rate Pressure Forepool under Load Rejection at Xinjiang Zangao Hydropower Station

作  者:罗昌辉 LUO Changhui(Xinjiang Institute of Water&Hydropower Engineering Investigation,Design and ResearchCo.,Ltd.,Urumqi 830000,China)

机构地区:[1]新疆维吾尔自治区水利水电勘测设计研究院,新疆乌鲁木齐830000

出  处:《云南水力发电》2025年第3期69-73,共5页Yunnan Water Power

基  金:国家自然基金项目(52068041)。

摘  要:錾高水电站工程为大流量引水式电站,渠道设计流量375.6 m^(3)/s,总线路长8.6 km,工程规模大,渠道线路长。在电站甩负荷紧急关机的情况下,引水渠首的控制闸门难以实现同时关闭。因此,紧急关机产生水击波在前池形成涌浪和引水渠持续来流将使前池水位升高。若水位超过前池边墙,将威胁厂房安全。甩负荷试验的目的为:①确定前池各工况最高涌波水位;②确定连接压力前池输水系统超高,尽可能使压力前池及输水系统的设计安全可靠且经济合理。Zangao Hydropower Station project is a high flow diversion type power station,with a designed channel flow of 375.6m3/s and a total bus length of 8.6km.The project has a large scale and a long channel route.In the case of emergency shutdown due to load shedding in the power station,it is difficult to achieve simultaneous closure of the control gates at the head of the diversion canal.Therefore,the emergency shutdown generates water hammer waves that form surges in the forebay and the continuous inflow of the diversion channel will cause the water level in the forebay to rise.If the water level exceeds the front pool wall,it will threaten the safety of the factory building.The purpose of the load rejection test is to determine the highest surge water level in each working condition of the forebay,and to determine the superelevation of the connected pressure forebay water delivery system,in order to make the design of the pressure forebay and water delivery system as safe,reliable,and economically reasonable as possible.

关 键 词:引水式电站 模型试验 压力前池 侧堰 

分 类 号:TV732[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象