检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:胡红平 王巍 杨建康 HU Hongping;WANG Wei;YANG Jiankang(POWERCHINA SINOHYDRO ENGINEERING BUREAU 14 CO.,LTD.,Kunming 650041,China)
机构地区:[1]中国水利水电第十四工程局有限公司,云南昆明650041
出 处:《云南水力发电》2025年第3期110-113,共4页Yunnan Water Power
摘 要:岩壁吊车梁是引水发电系统地下厂房大吨位起重桥机的重要支承结构,主要用于厂房金属结构施工、机电设备安装、机电设备维护等,在厂房建设中,岩壁吊车梁的施工是其中的重点和难点,其特点是成型难度大,对精度有很高的要求,技术难度大等方面。文章以浙江缙云抽水蓄能电站为例,讲述岩壁吊车梁施工工艺的应用与实践经验。The rock wall crane beam is an important supporting structure for the large tonnage crane bridge in the underground power plant of the water diversion and power generation system.It is mainly used for the construction of metal structures,installation of mechanical and electrical equipment,and maintenance of mechanical and electrical equipment in the plant.In the construction of the plant,the construction of the rock wall crane beam is a key and difficult point,characterized by high forming difficulty,high precision requirements,and high technical difficulty.The paper takes Jinyun Pumped Storage Power Station in Zhejiang Province as an example to describe the application and practical experience of rock wall crane beam construction technology.
分 类 号:TV743[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.222.183.98