管网工程人工清障施工方法  

Construction Method for Manual Obstacle Removal in Pipeline Engineering

在线阅读下载全文

作  者:朱家俊 ZHU Jiajun(Yunnan Dianzhong Water Diversion Phase II Project Co.,Ltd.,Kunming 650000,China)

机构地区:[1]云南省滇中引水二期工程有限公司,云南昆明650000

出  处:《云南水力发电》2025年第3期114-117,共4页Yunnan Water Power

摘  要:某管网工程,根据区域性地质资料和周边场地地勘报告,结合工程特点,10 m之内的地层自上而下分布的主要地层有:素填土、粉质黏土、粉细砂,但现场在实际做沉井过程中在地下3 m左右位置都发现有块石回填和大孤石情况,需人工清障后才能进行顶管施工,以保证施工目标的顺利实现,为后期人工清障积累施工经验,提供示范效应。According to regional geological data and surrounding site geological survey reports,the main strata distributed from top to bottom within 10 meters of a certain pipeline network project are:plain fill,silty clay,and fine sand.However,during the actual process of sinking the well on site,it was found that there were rock blocks backfilled and large isolated stones about 3 meters underground.It is necessary to manually clear the obstacles before carrying out the pipe jacking construction to ensure the smooth achievement of the construction goals.This article provides a demonstration effect for accumulating construction experience in manual obstacle clearance in the later stage.

关 键 词:管网工程 顶管 人工清障 施工方法 

分 类 号:TU753.64[建筑科学—建筑技术科学] TU991.33

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象