作 者:徐宝 匡改娣 XU Bao;KUANG Gaidi(Chuxiong Xinyuan Water Conservancy and Electric Power Survey and Design Co.,LTD.,Chuxiong 675000,China;Chuxiong Xinsheng Engineering Quality Inspection Co.,Ltd,Chuxiong 675000,China)
机构地区:[1]楚雄欣源水利电力勘察设计有限责任公司,云南楚雄675000 [2]楚雄欣盛工程质量检测有限公司,云南楚雄675000
出 处:《云南水力发电》2025年第3期133-136,共4页Yunnan Water Power
摘 要:龙虎水库自建成后渗漏量大,后经2次补强灌浆,效果仍然不理想。此次大坝除险加固采用左岸灌浆+右岸坝体、坝基混凝土防渗墙+右坝肩延长线灌浆的分部位不同防渗体系组合方案。防渗墙最大深度达91.5m,渗漏严重的基岩段也采用防渗墙防渗,入岩最大深度达82.2m,采用塑性混凝土和普通混凝土相结合。通过该工程的成功实施,积累了设计、施工、检测等方面的经验。Longhu Reservoir has experienced significant leakage since its construction,and despite two rounds of reinforcement grouting,the results are still unsatisfactory.This dam reinforcement adopts a combination of different anti-seepage systems,including left bank grouting,right bank dam body and foundation concrete anti-seepage wall,and right dam shoulder extension line grouting.The maximum depth of the anti-seepage wall is 91.5m,and anti-seepage walls are also used for severely leaking bedrock sections.The maximum depth into the rock is 82.2m,and a combination of plastic concrete and ordinary concrete is used.Through the successful implementation of this project,experience has been accumulated in design,construction,testing,and other aspects.
分 类 号:TV543.82[水利工程—水利水电工程] TV543.5