检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Zuyu Chen Shujing Chen Penghai Yin Shu Yu Naichang Zhang
机构地区:[1]State Key Laboratory of Simulation and Regulation of Water Cycle in River Basin,China Institute of Water Resources and Hydropower Research,Beijing,China [2]College of Civil and Transportation Engineering,Weifang Universtiy,Weifang,China [3]PowerChina Northwest Engineering Corporation Limited,Xi'an,China
出 处:《River》2025年第1期1-20,共20页江河(英文)
基 金:National Natural Science Foundation of China,Grant/Award Number:42330719;National Natural Science Foundation of China,Grant/Award Number:U2443228;Power Construction Corporation of China,Grant/Award Number:DJ-ZDXM-2021-51;China Institute of Water Resources and Hydropower Research,Grant/Award Number:GE121003A0042022。
摘 要:Check dams are widely constructed on China's Loess Plateau,which had a total number of 58,776 by the end of 2019.Great achievements in check dam construction have been gained regarding the economic and environmental impacts.This study reviews the remarkable benefits of check dams on the land reclamation and environmental improvement on the Loess Plateau,and sediment reduction entering the Yellow River.However,the flood incidents on check dams have been frequently reported for the past decades,which has attracted more attention in the context of climate change and extreme rainfall events recently.Advances in the flood migration techniques achieved by the research group led by the first author have been highlighted to migrate the breach risk of check dams due to floods.The“family tree method”has been proposed to determine the survival status and critical rainfall threshold of each check dam in the complicated dam system.An updated dam breach flood evaluation framework and the corresponding numerical algorithm(i.e.,DB-IWHR)have been developed.Moreover,innovative types of water-release facilities for check dams,including geobag stepped spillway and prestressed concrete cylinder pipe in the underlying conduit,have been proposed and developed.Finally,the perspectives concerning the check dam construction on the Loess Plateau have been put forward.
关 键 词:check dams China's Loess Plateau DB-IWHR “family tree method” geobag stepped spillway
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.137.214.24