检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Peng Wang Shi-shu Zhang Wei-dong Chen Yi-guo Xue Zi-ming Qu Hua-bo Xiao Mao-xin Su Kai Zhang 王鹏;张世殊;陈卫东;薛翊国;曲子鸣;肖华波;苏茂鑫;张开(中国电建集团成都勘测设计研究院有限公司,四川成都610072;山东大学岩土与地下工程研究院,山东济南250061;中国地质大学(北京)工程技术学院,北京100083)
机构地区:[1]PowerChina Chengdu Engineering Corporation Limited,Chengdu 610072,China [2]Institute of Geotechnical and Underground Engineering,Shandong University,Jinan 250061,China [3]School of Engineering and Technology,China University of Geosciences(Beijing),Beijing 100083,china
出 处:《Applied Geophysics》2025年第1期43-52,232,共11页应用地球物理(英文版)
基 金:National Natural Science Foundation of China(grant numbers 42293351,41877239,51422904 and 51379112).
摘 要:Advanced geological prediction is a crucial means to ensure safety and efficiency in tunnel construction.However,diff erent advanced geological forecasting methods have their own limitations,resulting in poor detection accuracy.Using multiple methods to carry out a comprehensive evaluation can eff ectively improve the accuracy of advanced geological prediction results.In this study,geological information is combined with the detection results of geophysical methods,including transient electromagnetic,induced polarization,and tunnel seismic prediction,to establish a comprehensive analysis method of adverse geology.First,the possible main adverse geological problems are determined according to the geological information.Subsequently,various physical parameters of the rock mass in front of the tunnel face can then be derived on the basis of multisource geophysical data.Finally,based on the analysis results of geological information,the multisource data fusion algorithm is used to determine the type,location,and scale of adverse geology.The advanced geological prediction results that can provide eff ective guidance for tunnel construction can then be obtained.超前地质预报是保证隧道安全高效施工的重要手段。然而,不同的超前地质预报方法都有其局限性,导致最终探测精度存在不足。采用多种方法进行综合评判,可以有效提高超前地质预报结果的准确性。本研究将地质信息与地球物理方法的探测结果相结合,包括瞬态电磁、激发极化和隧道地震波探测,以建立一种不良地质综合分析方法。首先,根据地质信息确定可能存在的主要不良地质问题。随后,根据多源地球物理数据推导出隧道掌子面前方岩体的各种物理参数。最后,基于地质信息的分析结果,采用多源数据综合分析方法确定不良地质的类型、位置和规模等,进而获得超前地质预报结果,为隧道施工提供有效的指导。
关 键 词:Advanced geological prediction Comprehensive analysis Geological information Transient electromagnetic Induced polarization Tunnel seismic prediction
分 类 号:P31[天文地球—固体地球物理学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7