机构地区:[1]南京国电南自轨道交通工程有限公司,江苏南京210100 [2]同方股份有限公司,北京100089
出 处:《工业控制计算机》2025年第3期30-31,共2页Industrial Control Computer
摘 要:深化设计是结合建筑结构、机电等专业设计资料进行的更深层次的施工图设计工作,其目的是对施工阶段所有层面的合理性和落地性进行更深层次的论证,指导项目实施的顺利进行。FAS系统在地铁建设中具有外设种类多、模块数量庞大、深化设计重复工作量大等特点,提出一种基于CAD.NET的FAS深化设计方法,使用工程基础配置和输入表进行图纸批量绘制。实践表明,该方法在图纸深化阶段可有效提高绘图的准确性、缩短绘图周期,为后期成套生产、现场调试预留充足的时间。Deepening design is a deeper level of construction drawing design work that combines professional design materials such as building structure and electromechanical engineering.Its purpose is to demonstrate the rationality and landing of all levels in the construction stage at a deeper level,and guide the smooth implementation of the project.The FAS system in subway construction has the characteristics of multiple types of peripherals,a large number of modules,and a large amount of repetitive work in deepening design.This paper presents a FAS deepening design method based on CAD.NET,that drawings are drawn in batches using engineering basic configuration and input tables.Practice has shown that this method can effectively improve the accuracy of drawing,shorten the drawing cycle.Sufficient time can be reserved for later complete sets of production and field commissioning during the drawing deepening stage.
关 键 词:火灾自动报警系统 轨道交通 C# CAD.NET 深化设计
分 类 号:TP3[自动化与计算机技术—计算机科学与技术]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.38