检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:雷翼展
机构地区:[1]华北水利水电大学,郑州450046
出 处:《科技创新与应用》2025年第8期133-135,140,共4页Technology Innovation and Application
摘 要:某水电站位于中国西南某河流上,发电厂房为引水式地下厂房,主要开发任务为发电,总装机容量1200 MW。结合引水式电站工程特点、机电设备布置需要及地质条件等对地下厂房进行合理布置及优化设计。主要介绍主厂房、副厂房和安装间的尺寸、结构、布置设计,其布置满足结构安全和功能需求,厂区结构布置紧凑、合理,可为类似工程设计提供参考。The hydropower station is located on a river in southwest China.The power plant is an underground plant with diversion.Its main development task is power generation,with a total installed capacity of 1200 MW.The rational layout and optimal design of the underground powerhouse were carried out according to the engineering characteristics of the diversion power station,the needs of mechanical and electrical equipment layout and geological conditions.The dimensions,structure and layout design of main workshop,auxiliary workshop and installation room were introduced.The layout meets the structural safety and functional requirements,and the plant structure is compact and reasonable,which can provide reference for similar engineering design.
关 键 词:水电站 地下厂房 布置设计 引水式电站 水利工程建设
分 类 号:TV731.6[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.219.198.219