火炬臂陆地建造安装工艺  

The Onshore Construction and Installation Method for Flare Boom

作  者:刘凌云[1] 闫清波[1] 胡学超 刘洋[2] 庄须全 LIU Lingyun;YAN Qingbo;HU Xuechao;LIU Yang;ZHUANG Xuquan(Offshore Oil Engineering(Qingdao)Co.,Ltd.,Qingdao 266520,China;Offshore Oil Engineering Co.,Ltd.,Tianjin 300452,China)

机构地区:[1]海洋石油工程(青岛)有限公司,山东青岛266520 [2]海洋石油工程股份有限公司,天津300452

出  处:《山东化工》2025年第4期219-223,共5页Shandong Chemical Industry

摘  要:以渤海某万吨级海洋平台为例,对其火炬臂陆地建造安装进行研究。从分段预制、尺寸控制、陆地运输和陆地安装等角度详细阐述了火炬臂的陆地建造安装工艺。此工艺高效简便,能够降低火炬臂陆地建造安装的安全风险,大大地提升火炬臂陆地建造安装的施工效率。Taking a 10000 t offshore platform in Bohai Sea as an example,the onshore construction and installation of its flare boom are studied.A onshore construction and installation method of the flare boom is described in detail from the aspects of sectional prefabrication,size control,onshore transportation and installation.This method is efficient and simple,which can reduce the safety risk of the flare boom onshore construction and installation,greatly improving the construction efficiency of the flare boom onshore construction and installation.

关 键 词:火炬臂 陆地建造 运输 安装 

分 类 号:TE95[石油与天然气工程—石油机械设备]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象