检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:孙亮[1] 罗瑞 鲁延鹏 孙萌萌 张恩源 SUN Liang;LUO Rui;LU Yanpeng;SUN Mengmeng;ZHANG Enyuan(School of Electrical Engineering,Northeast Electric Power University,Jilin 132000,Jilin Province,China;State Grid Chengde Electric Power Supply Company,Chengde 067000,Hebei Province,China;State Grid Longnan Electric Power Supply Company,Longnan 746000,Gansu Province,China)
机构地区:[1]东北电力大学电气工程学院,吉林省吉林市132000 [2]国网承德供电公司,河北省承德市067000 [3]国网陇南供电公司,甘肃省陇南市746000
出 处:《电力建设》2025年第3期34-47,共14页Electric Power Construction
基 金:国家自然科学基金项目(52377080)。
摘 要:极端冰灾导致系统停电、停产事故频发,发挥灵活应急资源(flexible emergency resources,FER)互补优势,协调多种FER参与调度有助于系统恢复,提出了冰灾下考虑灵活应急资源协同的综合能源系统运行框架。在灾前-预防阶段,构建鲁棒优化模型,求解FER预调度方案;在灾后-抵御和恢复阶段,建立考虑FER的综合能源系统双层优化模型,上层线路抢修情况与下层节点负荷削减情况实时传递,实现快速抢修的同时,通过移动储能队伍优化系统调度,减小系统综合负荷削减率以提高弹性。算例分析表明,所提框架能够有效使综合负荷削减率减小32.16%,提高了系统抵御灾害能力。Extreme ice disasters can cause frequent blackouts and shutdowns.Flexible Emergency Resources(FERs)play a complementary role.Coordinating multiple FERs to participate in scheduling facilitates system recovery.This study proposes an integrated energy system operation framework that considers FER coordination during ice disasters.In the predisaster prevention stage,a robust optimization model is constructed to solve the FER pre-scheduling scheme.In the postdisaster resistance and recovery phases,a two-layer optimization model of an integrated energy system considering the FER is established.Emergency repair of the upper line and load reduction of the lower node are transmitted in real-time to realize rapid emergency repair.Simultaneously,the system scheduling is optimized by the mobile energy storage team to reduce the comprehensive load reduction rate of the system and improve flexibility.The case study shows that the proposed framework can effectively reduce the comprehensive load reduction rate by 32.16%and improve the ability of the system to resist disasters.
关 键 词:冰灾 综合负荷削减率 灵活应急资源(FER) 综合能源系统 协同优化
分 类 号:TM73[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222