检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:尹金川 Yin Jin-chuan(China Railway 11th Bureau Group City Rail Engineering Co.,Ltd.,Wuhan 430074,Hubei Province,China)
机构地区:[1]中铁十一局集团城市轨道工程有限公司,湖北武汉430074
出 处:《建筑与装饰》2025年第6期127-129,共3页Construction & Decoration
摘 要:本文以洛阳地铁2号线王城北路站至机场路站区间左线侧穿右线大断面暗挖隧道近接施工为背景,针对盾构近接大断面隧道施工风险进行分析研究,制定了相关技术和管理措施,确保已完成的暗挖隧道不发生收敛形变超限,拱顶沉降超标等问题,为类似盾构近接施工提供参考。This paper investigates the shield tunneling technology used for side-passing large-span existing tunnels in urban rail transit,taking the side-passing construction of the left tunnel beneath the right tunnel in the section between Wangcheng North Road Station and Airport Road Station of Luoyang Metro Line 2 as the background.The study analyzes the risks associated with shield tunneling near large-span tunnels and formulates relevant technical and management measures to ensure that the existing excavated tunnels do not experience excessive convergence deformation or excessive crown settlement.This research provides references for similar shield tunneling projects.
分 类 号:U45[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222