盾构侧穿大断面暗挖既有隧道近接施工技术  

Analysis of Shield Tunneling Technology for Side-Passing Large-Span Existing Tunnels in Urban Rail Transit

在线阅读下载全文

作  者:尹金川 Yin Jin-chuan(China Railway 11th Bureau Group City Rail Engineering Co.,Ltd.,Wuhan 430074,Hubei Province,China)

机构地区:[1]中铁十一局集团城市轨道工程有限公司,湖北武汉430074

出  处:《建筑与装饰》2025年第6期127-129,共3页Construction & Decoration

摘  要:本文以洛阳地铁2号线王城北路站至机场路站区间左线侧穿右线大断面暗挖隧道近接施工为背景,针对盾构近接大断面隧道施工风险进行分析研究,制定了相关技术和管理措施,确保已完成的暗挖隧道不发生收敛形变超限,拱顶沉降超标等问题,为类似盾构近接施工提供参考。This paper investigates the shield tunneling technology used for side-passing large-span existing tunnels in urban rail transit,taking the side-passing construction of the left tunnel beneath the right tunnel in the section between Wangcheng North Road Station and Airport Road Station of Luoyang Metro Line 2 as the background.The study analyzes the risks associated with shield tunneling near large-span tunnels and formulates relevant technical and management measures to ensure that the existing excavated tunnels do not experience excessive convergence deformation or excessive crown settlement.This research provides references for similar shield tunneling projects.

关 键 词:盾构法 近接施工 暗挖隧道 

分 类 号:U45[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象