作 者:白涛涛 宋志琪 张国栋[1] 赵磊[1] 马有福 Bai Taotao;Song Zhiqi;Zhang Guodong;Zhao Lei;Ma Youfu(PetroChina Dushanzi Petrochemical Company,Dushanzi,Xinjiang,P.C.833600)
机构地区:[1]中国石油天然气股份有限公司独山子石化分公司,新疆独山子833699
出 处:《乙烯工业》2025年第1期34-37,I0001,I0002,共6页Ethylene Industry
摘 要:某1000 kt/a乙烯装置2019年利用大检修进行扩能改造,装置能力达到1100 kt/a乙烯。装置扩能后,持续高负荷运行,在夏季循环水温度高、裂解炉投退炉时,急冷水换热器换热能力无法满足生产要求,急冷水塔釜温、顶温过高,导致部分重烃和水经急冷水塔塔顶进入裂解气压缩机系统,导致压缩机运转负荷增大,加剧了压缩机叶轮流道结焦风险。通过增加急冷水换热器换热面积,解决了夏季和裂解炉投退炉期间换热器换热能力不足问题,延长了装置运行周期。A 1.0 Mt/a ethylene plant was modified during its overhaul in 2019 to expand its capacity to 1.1 million tons per year.After capacity expansion,the plant has been continuously operated at high load.The heat exchange capacity of quench water heat exchanger could not meet the production requirements when the temperature of circulating water was high in summer and during the feeding and unloading of cracking furnace.The kettle temperature and top temperature of quench water tower were too high,so that some heavy hydrocarbons and water entered the cracking gas compressor system through the top of the quench water tower,increasing the operating load of the compressor and intensifying the risk of coking in compressor impeller channel.By increasing the heat exchange area of quench water heat exchanger,the problem of insufficient heat exchange capacity of the heat exchanger in summer and during the feeding and unloading of cracking furnace was solved,the operation cycle of the plant was prolonged,and good effect was achieved.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49