检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:蒋亮星 余德江 吕小刚 蒋晓勇 游志恒 Jiang Liangxing;Yu Dejiang;Lyu Xiaogang;Jiang Xiaoyong;You Zhiheng(PetroChina Dushanzi Petrochemical Company,Dushanzi,Xinjiang,P.C.833699)
机构地区:[1]中国石油天然气股份有限公司独山子石化分公司,新疆独山子833699
出 处:《乙烯工业》2025年第1期53-54,I0002,共3页Ethylene Industry
摘 要:乙烯装置裂解炉在运行过程中需定期烧焦,烧焦气沉降罐为裂解炉烧焦时的核心设备。烧焦气沉降罐于1994年投用,在长时间使用过程中烧焦气沉降罐内部构件冲刷腐蚀严重,无法起到焦粒沉降分离作用,设备外表和地面受污染。为解决该问题,更换旋风式烧焦气沉降罐,提高焦粒去除率,烧焦气沉降罐周围面貌改善明显。Regular coke burning is required for cracking furnaces of ethylene plants during operation,and coke burning gas settling tank is the core equipment of cracking furnace.This article takes a coke burning gas settling tank,which was put into use in 1994,as an example.During long-term use,the internal components of the coke burning gas settling tank were seriously eroded and corroded,failing to settle and separate coke particles,and the surface of equipment and the ground were polluted.In order to solve this problem,a cyclone coke burning gas settling tank was used to improve the removal rate of coke particles,remarkably improving the surrounding area of the coke burning gas settling tank.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.248