基于改进GO法的垃圾焚烧发电厂电气主接线设计研究  

Research on electrical main wiring design of waste incineration power plant based on improved GO method

在线阅读下载全文

作  者:陈清波 廖远旭 CHEN Qingbo;LIAO Yuanxu(The Energy and Environmental Protection Division of China Light Industry Changsha Engineering Co.,Ltd.,Changsha,410114,China;China Energy Engineering Group Co.,Ltd.,Guangdong Electric Power Design and Research Institute,Guangzhou 510663,China)

机构地区:[1]中国轻工业长沙工程有限公司能源环保事业部,湖南长沙410114 [2]中国能源建设集团广东省电力设计研究院有限公司,广东广州510663

出  处:《电气应用》2025年第3期117-121,共5页Electrotechnical Application

摘  要:为提高垃圾焚烧发电厂电气主接线设计的科学性和准确性,为发电厂的稳定运行和高效发电提供有力保障,利用改进GO法,开展了电气主接线设计研究。首先,安装电量测量设备,采集垃圾焚烧发电厂发电量参数。然后,利用改进GO法,建立垃圾焚烧发电厂电气主接线的模型,对电气主接线系统进行划分,明确系统中各元件之间的关系以及它们对电气主接线系统的影响。在此基础上,进行电气主接线方案设计,并绘制电气主接线图。实验结果表明,应用所提设计方法后,电气主接线系统可用度更加接近1,整个系统的稳定性和可靠性得到了显著提升,这对于保障生产安全和提高垃圾焚烧发电厂的生产效率具有重要意义。In order to improve the scientificity and accuracy of the electrical main wiring design of waste incineration power plant,and to provide strong guarantee for the stable operation and efficient power generation of the power plant,the improved GO method was used to carry out the research on the electrical main wiring design.First of all,the installation of power measurement equipment,collect the waste incineration power plant power generation parameters.Secondly,by using the improved GO method,the main electrical wiring model of the waste incineration power plant is established,the main electrical wiring system is divided,and the relationship between the components in the system and the impact on the main electrical wiring system are clarified.On this basis,the electrical main wiring scheme is designed and the electrical main wiring diagram is drawn.The experimental results show that after the application of the proposed design method,the availability of the main electrical wiring system is closer to 1,and the stability and reliability of the whole system are significantly improved,which is of great significance for ensuring production safety and improving the production efficiency of the waste incineration power plant.

关 键 词:改进GO法 垃圾焚烧发电厂 设计 电气 主接线 

分 类 号:TM6[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象