检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘伟 Liu Wei(CCCC SHEC Construction Engineering Company Limited,Wuhan 430000,China)
机构地区:[1]中交二航局建筑工程有限公司,武汉430000
出 处:《黑龙江科学》2025年第6期156-158,161,共4页Heilongjiang Science
摘 要:使用层次分析(AHP)构建用于评估工程项目生命周期成本和风险的定量分析模型。模型包括成本因素、风险因素、时间因素和环境因素,进行专家评分和配对比较,计算各要素的权重,应用于实际项目的评估。结果显示,初期投资和运营成本是主要因素,材料价格波动和工程延误是主要风险。此结果有助于对项目成本和风险管理进行科学决策,确定关键因素并优化管理战略。The study constructs a quantitative analysis model for evaluating project life cycle cost and risk through AHP.The model includes cost,risk,time and environment factor.The study conducts expert score and pair comparison,calculates the weight of each factor,and applies to the actual project evaluation.The results show that initial investment and operating costs are the main factors,while material price fluctuations and project delays are the main risks.The results help to make scientific decisions on project cost and risk management,identify key factors and optimize management strategies.
分 类 号:TU723.3[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7