检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘灏 张根 LIU Hao;ZHANG Gen(CHN Energy Dadu River Pubugou Hydropower Plant,Ya’an 625304,China)
机构地区:[1]国能大渡河瀑布沟水力发电总厂,四川雅安625304
出 处:《水电与新能源》2025年第3期40-42,46,共4页Hydropower and New Energy
摘 要:水电站安全稳定控制装置能否正确动作,直接关系到水电站及区域电网安全的稳定运行。针对瀑布沟水电站安全稳定控制装置线路跳闸判断方法存在的不足,改进了线路跳闸判断方法,提出了安全稳定控制装置软硬件扩展实施方案。试验结果表明,改进后瀑布沟安全稳定控制装置能够准确判出电网故障并按既定策略可靠执行控制措施,提高了安全稳定控制装置的可靠性。Whether the safety and stability control devices in a hydropower station can correctly operate will directly affect the safe and stable operation of the station and the regional power grid.To address the problems of the line tripping judgement method for the safety and stability control devices in Pubugou Hydropower Station,the traditional line tripping judgement method is improved and a software and hardware improvement scheme for the safety and stability control devices are proposed.The experimental results show that the improved safety and stability control devices in Pubugou Hydropower Station can accurately detect power grid faults and reliably implement control measures according to pre-established strategies,and the reliability is greatly improved.
关 键 词:水电站 安全稳定控制装置 线路跳闸 无故障判断方法 4/3接线方式
分 类 号:TV698[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.171