检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:焦宝 蒋利宏 赵军[2] JIAO bao;JIANG lihong;ZHAO jun(Powerchina Kunming Engineering Corporation,Kunming 650033,China;Guiyang Aluminum-Magnesium Design&Research Institute Co.,Ltd.,Guiyang 550081,China)
机构地区:[1]中国电建集团昆明勘测设计研究院有限公司,云南昆明650033 [2]贵阳铝镁设计研究院有限公司,贵州贵阳550081
出 处:《水电与新能源》2025年第3期55-57,60,共4页Hydropower and New Energy
摘 要:随着光伏电站的迅速发展,升压站总图设计的重要性日益凸显。针对升压站总图设计内容,详细论述了现状分析、总平面图、场地竖向设计、道路设计、管线综合、场地内土石方、挡土墙及边坡护坡工程等校审过程中需重点关注的问题,以提高总图设计质量,助力光伏电站的高效、稳定运行。With the rapid development of photovoltaic power stations,the importance of the general drawing design of the booster stations is increasingly prominent.Regarding the overall content of the general drawing design work,the key issues that should be noticed in the check and review process are discussed in detail,including the analysis of current situation,overall layout,vertical design of the site,road design,pipeline integration,earthwork within the site,retaining walls,and slope protection work.The experience is helpful to improve the quality of the general drawing design,and ensure the efficient and stable operation of photovoltaic power stations.
分 类 号:TM615[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.129.206.232