检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:胡益 HU Yi(East China Electric Power Design Institute Co.,Ltd.of China Power Engineering Consulting Group,Shanghai 200063,China)
机构地区:[1]中国电力工程顾问集团华东电力设计院有限公司,上海200063
出 处:《电力勘测设计》2025年第3期90-94,共5页Electric Power Survey & Design
摘 要:电力总承包项目的利润在电力设计企业总利润中的占比日益增长,总承包项目的费用管理是实现项目利润的关键环节。对项目费用进行动态管理是实现费用目标的重点工作,文章通过建立项目全过程的动态管理流程,详细分析费用目标确定、费用计划制定、费用分析和费用纠偏措施等关键环节的内容及要求,为总承包项目更好实施费用管理提供支撑。The proportion of profits from general contracting projects in the total profits of enterprises is also increasing,so the cost management in project management will also occupy a more important position.Dynamic management of project costs is the key work to achieve cost objectives.This article establishes a dynamic management process for the entire project process,and introduces in detail the content and requirements of key links such as cost target determination,cost plan formulation,cost analysis,and cost correction measures,providing a reference for better implementation of cost management in EPC projects.
分 类 号:TK01[动力工程及工程热物理] TM-9[电气工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.171