焦作至平顶山高铁洛阳至汝州段线路方案研究  

Scheme research on the Jiaozuo-Pingdingshan high-speed railway of the Luoyang-Ruzhou section

在线阅读下载全文

作  者:闵浩峥 MIN Haozheng(China Railway SIYUAN Survey and Design Group Co.,Ltd.Wuhan 430063)

机构地区:[1]中铁第四勘察设计院集团有限公司线站院,武汉430063

出  处:《铁道勘测与设计》2025年第2期26-29,共4页Railway Survey and Design

摘  要:焦作至平顶山高铁位于河南省中西部,是呼南通道的重要组成部分,对促进中部地区加快崛起,改善豫西地区交通基础设施条件,加快构建现代化铁路基础设施体系具有重要意义。本文从线路功能定位、与规划铁路衔接情况、客流吸引力、对环境敏感点影响、重大工程拆迁、站间距布置、以及工程投资方面对洛阳至汝州段线路走向方案进行了综合比选,推荐采用经伊川西、汝阳东设站方案,为类似工程项目选线提供参考和借鉴。The Jiaoping Railway is located in the central-western region of Henan Province.As an important part of the Hohhot-Nanning High-speed Railway,it has significant implications for promoting the rise of the central region,improving the transportation infrastructure conditions in western Henan,and accelerating the construction of a modern railway infrastructure system.This article comprehensively compares the route alignment schemes of the Luoyang to Ruzhou section from the perspectives of line function positioning,alignment coordination with planned railway lines,passenger flow attraction,impact on sensitive environmental points,major engineering demolition,station spacing arrangement,and engineering investment.It is recommended to adopt the route passing through Yichuanxi and Ruyangdong,which can provide reference and guidance for similar engineering projects.

关 键 词:焦平高铁 洛阳至汝州 铁路选线 影响因素 方案比选 

分 类 号:F42[经济管理—产业经济]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象