车辆段场坪高程研究——以合肥新桥机场S1线工程岗集车辆段为例  

Research on the site elevation of vehicle base--Take the Gangji Depot of the S1 Line project at Hefei Xinqiao Airport as an example

在线阅读下载全文

作  者:雷霆 LEI Ting(China Railway SIYUAN Survey and Design Group Co.,Ltd.WUHAN 430063)

机构地区:[1]中铁第四勘察设计院集团有限公司城地院,武汉430063

出  处:《铁道勘测与设计》2025年第2期35-37,共3页Railway Survey and Design

摘  要:本论文以合肥新桥机场S1线工程岗集车辆段为例,在综合考虑防洪防涝要求、土方工程、市政道路接驳、排水方案以及出入线及车场线纵断面条件,对场坪高程控制因素进行分析。本车辆段场坪高程的确定具有典型性,可为之后的城市轨道交通项目站场场坪高程的确定提供参考。This paper takes the Gangji Depot of the S1 Line project at Hefei Xinqiao Airport as an example to analyze the factors controlling the elevation of the depot site,considering comprehensively the requirements for flood and waterlogging prevention,earthwork engineering,municipal road connections,drainage schemes,as well as the vertical section conditions of the entrance and exit lines and yard tracks.The determination of the site elevation for this depot is typical and can provide a reference for the determination of station and yard elevations in subsequent urban rail transit projects.

关 键 词:轨道交通 车辆基地 场坪标高 

分 类 号:U41[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象