检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:周礼文 ZHOU Liwen(China Railway SIYUAN Survey and Design Group Co.,Ltd,Wuhan 430063)
机构地区:[1]中铁第四勘察设计院集团有限公司总包部,湖北武汉430063
出 处:《铁道勘测与设计》2025年第2期91-94,共4页Railway Survey and Design
摘 要:本文以云南省青少年科技中心还建项目位于昆明地铁5号线圆通山站车站上方施工为背景,在复杂条件下采用Midas GTS数值模拟软件建立三维动态模型对地铁车站上盖结构施工过程进行模拟,对地铁车站结构及轨道结构的影响进行了研究。研究结果表明上盖结构施工对地铁车站结构及轨道结构的影响可控,各项变形指标、边坡稳定性和内力变化均满足控制要求。This article takes the construction of the Yunnan Youth Science and Technology Center project located above the Yuantongshan Station on Kunming Metro Line 5 as the background.Under these complex conditions,a three-dimensional dynamic model was established using Midas GTS numerical simulation software to simulate the construction process of the subway station cover structure,and the impact on the subway station structure and track structure was studied.The research results indicate that the construction of the overlying structure has a controllable impact on the subway station structure and track structure,and all deformation indicators,slope stability,and internal force changes meet the control requirements.
分 类 号:U23[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49