库区拦截警示浮排方案设计研究  

Design and Research of Intercepting Warning Floating Discharge Scheme in Reservoir Area

在线阅读下载全文

作  者:万光义 田均兵 Wan Guangyi;Tian Junbing(Guizhou Provincial Water Conservancy&Hydropower Investigation,Design and Research Institute Co.,Ltd,Guiyang 550001,China)

机构地区:[1]贵州省水利水电勘测设计研究院有限公司,贵阳550001

出  处:《黑龙江水利科技》2025年第3期5-8,共4页Heilongjiang Hydraulic Science and Technology

摘  要:枢纽首部工程经常有船只靠近溢洪道或取水口附近,泄洪或取水过程中存在安全隐患,需要在溢洪道进水渠、取水口等目标及重点防范部位外结合实际设置封闭式围栏。文章通过介绍库区拦截警示浮排布置、荷载计算、浮标设计参数、钢绞线设计,同时结合工程的现场实际情况,对比分析锚固墩和锚筋桩2种锚固端头的优劣,提出锚筋桩的锚固端头设计,进行了库区拦截警示浮排方案设计研究。研究为首部枢纽工程库区漂浮建筑的设计起到推动作用,可供类似库区警示、拦污导漂工程设计进行参考。It is often for ships to approach the spillway or water intake of the first pivotal project,and there are hidden dangers in the process of flood discharge or water intake,so it is necessary to set up closed fences outside the target and key prevention parts such as the water intake of the spillway inlet canal.Through introducing the intercept warning floating mat arrangement,load calculation,buoy design parameters and steel weir rope design for the reservoir area,meanwhile,combined with the actual situation of the project,the advantages and disadvantages of two anchoring ends of anchor pier and anchor reinforcement pile are compared and analyzed.The anchoring end design of anchor reinforcement pile is put forward,and the design and research of floating drainage scheme of intercepting warning in reservoir area is carried out in this paper.This design study plays a role in promoting the design of floating buildings in the reservoir area of the first hub project,and can be used as a reference for the design of similar reservoir area warning,pollution control and drift engineering.

关 键 词:拦截警示排 浮标 钢绞线 锚固端头 

分 类 号:TV697.2[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象