快速掘进下深部巷道片帮主控因素及调控技术研究  

Research on the main controlling factors and control technologies of rib spalling in deep roadways during rapid excavation

作  者:苏昊阳 王俊[1] 胡亚波 孔凯 张秀龙 孔令伟 高振 SU Haoyang;WANG Jun;HU Yabo;KONG Kai;ZHANG Xiulong;KONG Lingwei;GAO Zhen(College of Energy and Mining Engineering,Shandong University of Science and Technology,Qingdao,Shandong 266590,China;Shandong Energy Group Xibei Mining Co.,Ltd.,Xi’an,Shaanxi 710018,China;Jiangzhuang Coal Mine,Zaozhuang Mining(Group)Co.,Ltd.,Zaozhuang,Shandong 277519,China;Inner Mongolia Huangtaolegai Coal Co.,Ltd.,Ordos,Inner Mongolia 017300,China)

机构地区:[1]山东科技大学能源与矿业工程学院,山东省青岛市266590 [2]山东能源集团西北矿业有限公司,陕西省西安市710018 [3]枣庄矿业(集团)有限责任公司蒋庄煤矿,山东省枣庄市277519 [4]内蒙古黄陶勒盖煤炭有限公司,内蒙古自治区鄂尔多斯市017300

出  处:《中国煤炭》2025年第3期70-83,共14页China Coal

基  金:国家自然科学基金资助项目(52204100)。

摘  要:为分析掘锚一体机快速掘进条件下深部巷道片帮主要影响因素及其人工调控方法,以巴彦高勒煤矿53101工作面运输巷地质条件与生产技术为背景,采用FLAC3D数值模拟软件开展了掘锚一体机快速掘进下深部巷道片帮破坏多因素正交实验,获得了地质与生产技术主要影响因素的敏感度。掘锚一体机快速掘进条件下,深部巷道片帮的主控影响因素为初始应力环境、掘进面尺寸、空顶距和煤层抗拉强度;针对深部巷道片帮主控影响因素,使用煤柱爆破卸压技术进行了工业性实验,有效控制了巴彦高勒煤矿53101工作面运输巷巷帮片帮问题。To investigate the main influencing factors and control methods for rib spalling in deep roadways under rapid excavation conditions using an integrated mining and anchoring machine,based on the geological conditions and production technology of the 53101 working face transportation roadway in the Bayan Gaole Coal Mine,FLAC 3D numerical simulation software was utilized to conduct a multi-factor orthogonal experiment on rib spalling failure in deep roadways during rapid excavation.The sensitivity of key geological and production factors was determined.The primary controlling factors for rib spalling under these conditions were identified as the initial stress environment,excavation face dimensions,unsupported roof distance,and tensile strength of the coal seam.Industrial experiments employing coal pillar blasting and pressure relief technology were conducted to address these controlling factors,effectively mitigating rib spalling in the 53101 working face transportation roadway.

关 键 词:快速掘进 片帮 拉破坏 正交实验 敏感度 

分 类 号:TD353[矿业工程—矿井建设]

 