作 者:冯冉 吴绍辉 郭世永 FENG Ran;WU Shaohui;GUO Shiyong(Dongtan Coal Mine,Yankuang Energy Group Co.,Ltd,Zoucheng 273500,China;Shandong Energy Group General Dispatch Room,Jinan 250013,China)
机构地区:[1]兖矿能源集团股份有限公司东滩煤矿,山东邹城273500 [2]山东能源总调度室,山东济南250013
出 处:《煤矿现代化》2025年第3期133-137,共5页Coal Mine Modernization
摘 要:为解决复杂条件影响下工作面末采支护难度大问题,以东滩煤矿3308综放工作面为工程背景,基于现场复杂工程条件及设备条件,综合考虑调斜开采、支架及运输机控制、上网方式等方面,设计制定了合理的大采高末采上网方案,并成功应用于现场,有效的保障了工作面正常回撤,简化了作业流程,提高了作业效率。In order to solve the problem of difficulty in supporting the final mining of the working face under complex conditions,taking the 3308 fully mechanized caving working face of Dongtan Coal Mine as the engineering background,based on the complex engineering conditions and equipment conditions on site,and taking into account the control of inclined mining,support and conveyor,and grid connection methods,a reasonable plan for high mining height final mining and grid connection has been designed and developed,which has been successfully applied on site,effectively ensuring the normal withdrawal of the working face and simplifying the operation process,Improved homework efficiency.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.200