作 者:黄学刚 赵伟 马军英[1] Huang Xuegang;Zhao Wei;Ma Junying(Beijing Urban Construction Group Co.,Ltd.,Beijing 100088,China)
出 处:《岩土工程技术》2025年第2期232-238,共7页Geotechnical Engineering Technique
摘 要:某雨水泵站基坑深16.16 m,采用支护桩+4道钢管内支撑支护。泵站地下二层高8.9 m,原设计方案第三道支撑拆撑未设置有效换撑,第三道支撑拆除后将导致地下二层侧墙处于悬臂状态,严重影响基坑和泵站结构的安全。结合雨水泵站的结构特征,采用永临结合的换撑方案,在(2)—(5)轴侧墙第三道支撑下1 m处设置暗梁和永久混凝土梁作为换撑,既解决了基坑的换撑问题,又不影响泵站的使用功能,避免了有限空间内拆换撑的安全风险。结合基坑开挖阶段的监测数据,运用有限元软件midas GTS建立基坑施工过程的三维数值模型,从支护桩深层水平位移、钢支撑轴力及立柱沉降等方面对三维数值模型的合理性进行验证,再利用验证后的模型对基坑拆撑工况进行模拟,预测基坑变形。分析结果表明基坑换撑优化设计方案安全可靠、合理可行,可为类似工程参考。The foundation pit of a rainwater pump station is 16.16 meters deep and is supported by retaining piles and 4 steel pipes.The underground second floor of the pump station has a height of 8.9 meters.The original design plan did not include an effect-ive replacement of the third support when it was removed.The removal of the third support will cause the side walls of the under-ground second floor to be in a cantilever state,seriously affecting the safety of the foundation pit and pump station structure.Based on the structural characteristics of the rainwater pump station,a permanent and temporary support replacement scheme was adopted.A hidden beam and a permanent concrete beam were installed 1 meter below the third support on the side walls of axes②-⑤as replace-ment supports,which not only solves the problem of replacement supports in the foundation pit but also does not affect the use func-tion of the pump station,avoiding the safety risks of dismantling and replacing supports in limited space.Based on the monitoring data during the excavation stage of the foundation pit,a three-dimensional numerical model of the foundation pit construction process was established using the finite element software Midas GTS.The rationality of the three-dimensional numerical model was verified from the aspects of deep horizontal displacement of support piles,steel support axial force,and column settlement.Then,the validated mod-el was used to simulate the dismantling and support conditions of the foundation pit and predict the deformation of the foundation pit.The analysis results indicate that the optimized design scheme for replacing supports in foundation pits is safe,reliable,reasonable,and feasible,and can serve as a reference for similar engineering projects.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7