基于BIM的工程造价动态管理与优化策略研究  

Research on Dynamic Management and Optimization Strategies of Engineering Cost Based on BIM

在线阅读下载全文

作  者:陈赟琪 CHEN Yunqi(Dongnan Construction Management Co.,Ltd.,Huzhou,Zhejiang,313000,China)

机构地区:[1]东南建设管理有限公司,浙江湖州313000

出  处:《智能城市应用》2025年第3期72-74,共3页Smart City Application

摘  要:随着BIM技术在建筑行业的广泛应用,工程造价的动态管理与优化成为提升项目管理效率和精度的关键。通过BIM技术对工程造价进行全过程监控和分析,可以实现实时数据更新、预警机制及成本优化,从而提高决策水平并降低工程成本。结合BIM的可视化、协同工作平台和大数据分析,优化了造价管理的流程和策略,提升了项目的整体经济效益和管理透明度。With the widespread application of BIM technology in the construction industry,dynamic management and optimization of engineering costs have become the key to improving project management efficiency and accuracy.By using BIM technology to monitor and analyze the entire process of engineering cost,real-time data updates,warning mechanisms,and cost optimization can be achieved,thereby improving decision-making level and reducing engineering costs.By combining BIM visualization,collaborative work platform,and big data analysis,the process and strategy of cost management have been optimized,enhancing the overall economic benefits and management transparency of the project.

关 键 词:BIM技术 工程造价 动态管理 优化策略 成本控制 

分 类 号:F407.9[经济管理—产业经济]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象