隔振支座施工流程及处理措施  

Construction Process and Treatment Measures for Vibration Isolation Bearings

在线阅读下载全文

作  者:刘文柱 LIU Wen-zhu(Beijing Huacheng Engineering Management Consulting Co.Ltd.,Beijing 100000,China)

机构地区:[1]北京华城工程管理咨询有限公司,北京100000

出  处:《工程建设与设计》2025年第6期141-143,共3页Construction & Design for Engineering

摘  要:合肥新桥国际机场旅客过夜用房作为振震双控的隔振建筑,采用在建筑下方单独设置隔振层放置隔振支座和限位装置的方式减小轨交激励下的楼层振动影响。针对隔振施工中预埋件安装流程、支座节点构造复杂以及支座安装困难等特点,采取保留支座预埋定位板、节点构造优化、施工机具配合等措施,确保了隔振支座的顺利安装。The passenger overnight room of Hefei Xinqiao International Airport is used is a vibration isolation building with double vibration isolation control,with the vibration isolation support and limit device under the building to reduce the vibration influence under the rail crossing incentive.In view of the characteristics of the installation process of embedded parts,the complex structure of support nodes and the difficulty of support installation in vibration isolation construction,measures such as retaining support embedded positioning plate,node structure optimization,construction machinery and tools cooperation are taken to ensure the smooth installation of vibration isolation support.

关 键 词:隔振支座 限位装置 隔振支座安装 合肥新桥国际机场 

分 类 号:TU352.1[建筑科学—结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象