焦化塔底阀密封副结构优化设计  

Optimization Design of Structure of Sealing Pair for Bottom Valve of Coking Tower

在线阅读下载全文

作  者:张龙奎 刘晓东 王亚青 陈增晖 陈祥佩 张春景 张伟伟 Zhang Longkui;Liu Xiaodong;Wang Yaqing

机构地区:[1]中国石油集团渤海石油装备制造有限公司,天津300457 [2]渤装(兰州)石化装备制造有限公司,兰州730060 [3]甘肃省炼化特种装备技术创新中心,兰州730060

出  处:《机械制造》2025年第3期19-25,共7页Machinery

基  金:甘肃省科技计划资助项目(编号:1206GTGA014)。

摘  要:焦化塔底阀是延迟焦化装置的关键设备。按照相关标准技术要求,对焦化塔底阀密封副进行结构优化,并采用有限元方法进行密封比压计算和阀体与密封副间隙计算,以满足延焦化装置对焦化塔底阀使用寿命与安全性、可靠性的高要求。The bottom valve of the coking tower is the key equipment of the delayed coking unit.In order to meet the high requirements of the delayed coking unit for the service life,safety,and reliability of the bottom valve of the coking tower,the structure of sealing pair for the bottom valve of the coking tower was optimized according to the technical requirement of relevant standard,and the finite element method was used to calculate the sealing specific pressure and the gap between the valve body and sealing pair.

关 键 词:焦化塔 底阀 密封副 结构优化 设计 

分 类 号:TE962[石油与天然气工程—石油机械设备]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象