检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王洛怡 Wang Luo-yi
机构地区:[1]中交四航局第五工程有限公司,福州350001
出 处:《建筑技术开发》2025年第4期130-133,共4页Building Technology Development
摘 要:随着交通基础设施建设的不断推进,小净距隧道施工面临着诸多挑战。基于猴屿隧道项目,研究小净距隧道双侧壁导坑法施工下的围岩变形与压力分布规律,并对施工过程中围岩压力和变形进行监测。监测结果表明:在双侧壁导坑法施工过程中,不同开挖区对围岩压力与变形产生显著影响。With the continuous advancement of transportation infrastructure construction,the construction of small clearance tunnels is facing many challenges.Based on the Monkey Island Tunnel project,this study investigates the deformation and pressure distribution of the surrounding rock during the construction of a small clearance tunnel using the double-sided wall guide method,and monitors the pressure and deformation of the surrounding rock during the construction process.The monitoring results indicate that different excavation zones have a significant impact on the pressure and deformation of the surrounding rock during the construction process of the double-sided wall guide method.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.200