小净距隧道双侧壁导坑法施工下围岩压力与变形分析  

ANALYSIS OF SURROUNDING ROCK PRESSURE AND DEFORMATION UNDER THE CONSTRUCTION OF DOUBLE SIDED WALL PILOT PIT METHOD IN SMALL CLEAR DISTANCE TUNNEL

在线阅读下载全文

作  者:王洛怡 Wang Luo-yi

机构地区:[1]中交四航局第五工程有限公司,福州350001

出  处:《建筑技术开发》2025年第4期130-133,共4页Building Technology Development

摘  要:随着交通基础设施建设的不断推进,小净距隧道施工面临着诸多挑战。基于猴屿隧道项目,研究小净距隧道双侧壁导坑法施工下的围岩变形与压力分布规律,并对施工过程中围岩压力和变形进行监测。监测结果表明:在双侧壁导坑法施工过程中,不同开挖区对围岩压力与变形产生显著影响。With the continuous advancement of transportation infrastructure construction,the construction of small clearance tunnels is facing many challenges.Based on the Monkey Island Tunnel project,this study investigates the deformation and pressure distribution of the surrounding rock during the construction of a small clearance tunnel using the double-sided wall guide method,and monitors the pressure and deformation of the surrounding rock during the construction process.The monitoring results indicate that different excavation zones have a significant impact on the pressure and deformation of the surrounding rock during the construction process of the double-sided wall guide method.

关 键 词:双侧壁导坑法 围岩压力 变形分析 

分 类 号:TU455.4[建筑科学—岩土工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象