装配式防浪墙在利民水库工程中的设计及运用  

Design of Prefabricated Wave Wall and Application in Limin Reservoir Project

在线阅读下载全文

作  者:董仲祥 李亚凯 DONG Zhongxiang;LI Yakai(Shandong Dayu Water Affairs Construction Group Co.,LTD.,Jinan,Shandong 250102,China;Hydraulic Engineering Construction Supervision Co.,LTD.,of Shandong Province,Jinan,Shandong 250014,China)

机构地区:[1]山东大禹水务建设集团有限公司,山东济南250102 [2]山东省水利工程建设监理有限公司,山东济南250014

出  处:《山东水利》2025年第2期39-42,共4页Shandong Water Resources

摘  要:在水库坝顶防浪墙设计中,目前普遍采用现浇混凝土结构,现浇混凝土结构易产生裂缝,外观质量较为单一,防浪墙顺直度难以保证,为克服以上难点,采用装配式防浪墙结构能很好地解决这些难点。装配式防浪墙经过设计改进防浪效果加强、增加功能,工厂化生产保证了墙体质量、提高整体外观质量,现场安装缩短了施工工期、降低了工程造价,既符合国家产业政策,又达到了节能减排的目标。In the design of the wave wall at the top of the reservoir dam,cast-in-place concrete structure is generally used at present,which is easy to crack,and the appearance is relatively simple,even the straightness of the wave wall is difficult to guarantee.In order to tackle the above difficulties,the prefabricated wave wall structure is used to solve these difficulties.The prefabricated wave wall has been designed and improved to strengthen the anti-wave effect and increase the function.As well,the factory production ensures the quality of the wall,improves the overall appearance,and the on-site installation shorten the construction period and reduces the project cost,which is in line with the national industrial policy and achieves the goal of energy saving and emission reduction.

关 键 词:装配式防浪墙 利民水库 混凝土结构 

分 类 号:TV697[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象