茌平区水源置换项目加压泵站施工措施  

Construction Measures on Pressure Pump Station in Water Source Displacement Project in Chiping

在线阅读下载全文

作  者:李博 李鹏程 王勇 LI Bo;LI Pengcheng;WANG Yong(Water Resources Bureau of Chiping District,Liaocheng Municipality,Liaocheng,Shandong 252100,China;New Energy Investment(Shandong)Co.,LTD.,Water Resources Development Group,Jinan,Shandong 250100,China)

机构地区:[1]聊城市茌平区水利局,山东聊城252100 [2]水发新能源投资(山东)有限公司,山东济南250100

出  处:《山东水利》2025年第2期49-51,共3页Shandong Water Resources

摘  要:通过对聊城市茌平区水源置换项目工程入库泵站施工过程分析和实地调研,详细介绍了泵站施工前的准备工作、泵站主体结构施工、泵站设备安装和调试等。通过这些技术措施的实施,能够保证泵站施工的顺利进行,为茌平区水源置换项目的成功实施奠定基础。Through the analysis and field investigation of the construction process of the pumping station of water source replacement project in Chiping District,Liaocheng Municipality,this paper makes a detailed introduction on the preparation work before the construction,the main structure construction of the pumping station,and the installation and commissioning of the pumping station equipment.Through the implementation of these technical measures,it can ensure the smooth construction of the pumping station,which is the foundation for the successful implementation of the water source replacement project Chiping District.

关 键 词:聊城市 茌平区 水源置换 泵站施工 

分 类 号:TV213.4[水利工程—水文学及水资源]

 