检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王庆 WANG Qing(CCCC Water Resources And Hydropower Construction Co.,Ltd.)
机构地区:[1]中交水利水电建设有限公司
出 处:《广东建材》2025年第4期152-154,共3页Guangdong Building Materials
摘 要:以宁波至象山市域铁路工程项目为例,研究了桩基施工技术的优化分析。首先介绍了工程参数及相关规范,包括雨季施工、桩基类型及车辆通行等限制因素。然后针对不同桩径进行了施工工艺与方法的详细分析,提出了在钻孔灌注桩施工过程中应注意事项。最后,对比了传统施工方案和优化施工方案,通过对成本、效率、质量等方面进行比较,证明优化施工方案具有一定的经济效益和工程技术优势。The optimization analysis of pile foundation construction technology was studied with the Ningbo to Xiangshan Urban Rail Project as a case study.Firstly,the project parameters and relevant regulations are introduced,including constraints such as construction during the rainy season,pile type,and vehicle passage.Then,a detailed analysis is conducted on the construction process and methods for different pile diameters,and precautions during the drilling and grouting pile construction process are proposed.Finally,a comparison between traditional and optimized construction schemes is made,proving that the optimized construction scheme has certain economic benefits and engineering technical advantages through a comparison of cost,efficiency,quality,and other aspects.
分 类 号:TU7[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.248