核电厂系统设备充排水辅助装置的研究与设计  

Study and Design of Auxiliary Devices for Charging and Drainage of Nuclear Power Plant System Equipment

在线阅读下载全文

作  者:谷铁 GU Tie(Fujian Fuqing Nuclear Power Co.,Ltd.,Fuqing,Fujian Prov.350318,China)

机构地区:[1]福建福清核电有限公司,福建福清350318

出  处:《中国核电》2025年第1期14-18,共5页China Nuclear Power

摘  要:核电厂工艺系统设备的充水排气和排水充气的动力主要来源于流体自身压力和管网高度差,过程通常耗时长,充气排水时可能存在残水,充水排气时可能存在残气。通过设计“核电厂系统设备充排水辅助装置”及其控制界面,引入水泵和气泵的动力源,对需要充水或是疏排水的管道进行主动式的流体传输,提高流体传输的效率和效果。用于核电厂工艺系统隔离检修时,辅助排水充气和充水排气,提升排水充气、充水排气操作的工作效率和可靠性。The traditional power sources for water filling,exhaust,drainage,and inflation in power plant process systems mainly coming from the fluid's own pressure and the height difference of the pipeline network.The process is usually time-consuming,and there may be residual water during drainage and residual gas during water filling and exhaust.By designing the auxiliary device for water filling and drainage of power plant system equipment and its control interface,introducing power sources for water pumps and air pumps,active fluid transmission can be carried out for pipelines that require water filling or drainage,improving the efficiency and effectiveness of fluid transmission.Used for isolation and maintenance of power plant process systems,to assist in drainage,inflation,water filling,and exhaust operations,improving the efficiency and reliability of drainage,inflation,water filling,and exhaust operations.

关 键 词:排水充气 充水排气 流体传输 水泵 气泵 

分 类 号:TM623[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象