检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:钱厚军 沈卫玲 秦景泉 陈富杰 徐文网 李杨 QIAN Houjun;SHEN Weiling;QIN Jingquan;CHEN Fujie;XU Wenwang;LI Yang(Nuclear Power Operation and Management Co.,Ltd.,CNNP,Haiyan,Zhejiang Prov.314300,China)
机构地区:[1]中核核电运行管理有限公司,浙江海盐314300
出 处:《中国核电》2025年第1期28-32,共5页China Nuclear Power
摘 要:秦山核电厂1号机组自投运以来发电机轴电压一直采用人工测量的方式。为提高机组安全性和可靠性,经决策改进大轴接地装置并加装轴电压在线监测装置。本文通过对350 MW发电机改进大轴接地装置与加装轴电压在线监测装置的设计、安装调试及运行情况的分析,得出需重点关注汽侧轴对地电压与励侧轴承座绝缘情况,供同行参考。The shaft voltage of Unit 1 of Qinshan Nuclear Power Plant was always measured manually since it was put into operation.In order to improve the safety and operation reliability of the unit,it was decided to modify the shaft grounding device and add a shaft voltage online monitoring device.This paper introduces the design,installation,commissioning and operation,and emphasizes that the voltage of the steam side shaft to ground and the insulation of excitation side bearing seat should be paid more attention,and should be used for peer reference.
关 键 词:轴电压 大轴接地装置 设计与调试 运行情况 关注重点
分 类 号:TM623[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.170