核电厂设备维修能力评估方法探索与实践  

Exploration and Practice of the Evaluation Method for Maintenance Capability of Nuclear Power Plant Equipment

在线阅读下载全文

作  者:史思明 黄金 常森伟 葛帅 黄明 苏发昌 吴昊 张心兰 SHI Siming;HUANG Jin;CHANG Senwei;GE Shuai;HUANG Ming;SU Fachang;WU Hao;ZHANG Xinlan(State Nuclear Power Demonstration Plant Co.,Ltd.,Weihai,Shandong Prov.264300,China)

机构地区:[1]国核示范电站有限责任公司,山东威海264300

出  处:《中国核电》2025年第1期73-78,共6页China Nuclear Power

摘  要:“国和一号”示范工程自从启动维修准备工作以来,经过多年的探索与实践,逐步建立了一套科学、规范的核电厂设备维修能力评估方法,该方法通过制定客观、量化的评分细则和评价标准,对设备维修所需的人员、文件、物资、环境、外部支持等各方面能力进行逐项评估,直观展现出设备维修能力水平,为维修准备工作提供了有效指导。Since the start of the maintenance preparation work of CAP1400,after years of exploration and practice,a scientific and standardized method for evaluating the maintenance capability of nuclear power plant equipment has been gradually established.This method establishes objective and quantitative scoring rules and evaluation standards to evaluate the personnel,documents,materials,environment,external support and other abilities required for equipment maintenance one by one,intuitively demonstrating the level of equipment maintenance capability and providing effective guidance for maintenance preparation work.

关 键 词:核电厂 维修能力 “国和一号” 评估方法 

分 类 号:TM623[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象