阁老湾水库泄洪洞洞身加固方案设计  

Design of Reinforcement Scheme for the Spillway Tunnel Body of Gelaowan Reservoir

在线阅读下载全文

作  者:孙冬艳[1] SUN Dong-yan

机构地区:[1]山西省水利水电勘测设计研究院有限公司,山西太原030024

出  处:《山西水利科技》2025年第1期1-3,共3页Shanxi Hydrotechnics

摘  要:兴县阁老湾水库于1982年建成,受修建时间早、运行时间长等因素影响,水库存在多种安全隐患,亟需进行除险加固。针对水库泄洪洞洞身存在的主要问题,从泄洪洞过流能力、投资、施工工序及难易程度等方面分析比较,确定洞身加固方案,可为同类型水库除险加固设计提供参考。The Gelaowan Reservoir in Xingxian County was built in 1982.Due to the early construction and long operation time,the reservoir has multiple safety hazards and urgently needs to be reinforced.In response to the main problems existing in the spillway tunnel of reservoirs,an analysis and comparison were conducted from the aspects of spillway capacity,investment,construction process,and difficulty level,and a reinforcement plan for the tunnel body was determined.This achievement can provide reference for the reinforcement design of similar reservoirs.

关 键 词:泄洪洞 洞身加固 方案设计 阁老湾水库 

分 类 号:TV697[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象