检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:吴德松 WU Desong(Sanming Yiyuan Electric Power Survey and Design Co.,Ltd.,Sanming,Fujian Province,365000 China)
机构地区:[1]三明亿源电力勘察设计有限公司,福建三明365000
出 处:《科技资讯》2025年第5期102-104,共3页Science & Technology Information
摘 要:随着社会经济的不断发展,各行各业对电力资源的需求不断增加,因此,我国不断优化和完善城市电网系统。在输电线路中,架空输电线路杆塔基础属于关键部分,并发挥着重要的作用。合理设置架空输电线路杆塔结构,有利于保障输电线路运行的稳定性,避免发生安全问题。因此,需要加强研究电力架空输电线路杆塔基础的设计和施工技术,以优化整体电网系统的使用性能,推动我国电力行业健康发展。With the continuous development of social economy,the demand for power resources in all walks of life isincreasing.Therefore,China continues to optimize and improve the urban power grid system.In transmission lines,the foundation of overhead transmission line tower foundation is a key part and plays an important role.Reasonablysetting up the tower structure of overhead transmission line is conducive to ensuring the stability of transmission line operation and avoiding safety problems.Therefore,it is necessary to strengthen the basic design and construction tech-nology of power foundations for overhead power transmission line poles and towers,so as to optimize the perfor-mance of the overall power grid system and promote the healthy development of China's power industry.
分 类 号:TM73[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.33