检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王仕明 WANG Shiming(Guizhou Qianshui Project Supervision Co.,Ltd.,Guiyang,Guizhou Province,550002 China)
机构地区:[1]贵州黔水工程监理有限责任公司,贵州贵阳550002
出 处:《科技资讯》2025年第5期168-170,共3页Science & Technology Information
摘 要:国民经济的持续发展和城镇化进程的不断加快推动了建筑领域的发展与革新,高层住宅项目越来越多,基础埋深也在持续扩大。在实际施工中,施工现场容易受到地质和地形方面的影响,这就对基坑开挖提出更高的要求。因此,施工团队需要结合工程具体状况制订科学合理的施工计划,并全面掌握各个施工要点,以提升整个工程建设的质量与效率。With the continuous development of the national economy and the acceleration of urbanization,the de-velopment and innovation of the construction field have been promoted.There are more and more high-rise resi-dential projects,and the depth of foundation burial is also continuously expanding.In actual construction,due tothe susceptibility of the construction site to geological and topographical influences,higher requirements have beenput forward for excavation of foundation pits.Therefore,it is necessary to formulate a scientific and reasonable con-struction plan based on the specific conditions of the project,and comprehensively grasp various constructionpoints,in order to improve the quality and efficiency of the entire project construction.
分 类 号:TU753[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.200