检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王伟 WANG Wei(Shanxi Coking Coal Huozhou Coal Electricity Hongya Coal Industry Co.,Ltd.,Linfen 041612,Shanxi,China)
机构地区:[1]山西焦煤霍州煤电洪崖煤业有限公司,山西临汾041612
出 处:《凿岩机械气动工具》2025年第4期167-169,共3页Rock Drilling Machinery & Pneumatic Tools
摘 要:为改善综采面沿空巷道的围岩应力环境,实现安全高效开采,文章通过数值模拟和现场试验,提出深孔爆破切顶卸压技术。应用效果表明,预裂爆破能够改变围岩的应力分布特征,卸压效果好;相比于非爆破方式,预裂爆破范围内的围岩变形量小,且工作面前方30 m范围内的巷道宽度明显增大;在回采期间,各测站的围岩变形量均较小,表明该切顶卸压技术在控制围岩稳定性方面发挥了积极作用。In order to improve the surrounding rock stress environment of gob-side roadway in fully mechanized mining face and realize safe and efficient mining,this paper puts forward deep hole blasting roof cutting and pressure relief technology through numerical simulation and field test.The application results show that the pre-splitting blasting can change the stress distribution characteristics of the surrounding rock,and the pressure relief effect is good;compared with non-blasting method,the surrounding rock deformation in the pre-splitting blasting range is small,and the width of the roadway in the range of 30 m in front of the working face is obviously increased;during the stoping period,the surrounding rock deformation at each observation station is small,indicating that the roof cutting and pressure relief technology has played a positive role in controlling the stability of the surrounding rock.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7