检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杨结春 朱杰鸿 马维勇 YANG Jiechun;ZHU Jiehong;MA Weiyong(Guilin Power Capacitor Co.,Ltd,Guangxi Guilin 541004,China;School of Mechanical and Electrical Engineering,Guangxi Guilin University of Electronic Technology,Guangxi Guilin 541004,China)
机构地区:[1]桂林电力电容器有限责任公司,广西桂林541004 [2]桂林电子科技大学机电工程学院,广西桂林541004
出 处:《高压电器》2025年第4期139-149,共11页High Voltage Apparatus
基 金:广西科技计划项目(AD21220035)。
摘 要:新疆地区高地震带强风沙环境条件对±800 kV直流极限RI电容器组的抗震和抗风性能影响较大,文中以新疆某特高压直流工程换流站±800 kV直流极限RI电容器组为研究对象,采用通用有限元软件MidasGen进行有限元分析。首先定义材料和截面,建立±800 kV直流极限RI电容器组的Midas Gen模型,然后施加边界条件和载荷工况,仿真分析得到电容器塔架的模态、振型、应力和位移,结果表明±800 kV直流极线RI电容器组满足8度(0.2g)抗震要求。针对新疆地区强风沙环境对电容器塔架位移振动的影响,提出一种可以有效降低电容器塔架位移的防风加固措施,利用Midas Gen仿真结果表明防风加固措施对降低电容器塔架位移效果明显,为新疆地区高地震带强风沙环境条件下±800 kV直流极线RI电容器组的设计改进提供理论依据,确保特高压工程设备安全可靠运行。The high seismic zone and strong sandstorm environment in Xinjiang region has significant influence on the seismic and wind-proof performance of±800 kV DC limit RI capacitor bank.In this paper,the±800 kV DC limit RI capacitor bank at a certain UHV DC converter station in Xinjiang is taken as the study object and the finite ele-ment analysis is performed by using the general finite element software Midas Gen.Firstly,the material and section are defined,and the Midas Gen model of the±800 kV DC limit RI capacitor bank is set up.Then,the boundary condi-tions and load cases are applied to obtain the modal,vibration mode,stress and displacement of the capacitor tower by simulation and analysis.The results show that the±800 kV DC limit RI capacitor bank meets the seismic require-ments of 8 degrees(0.2g).In view of the influence of the strong sandstorm environment on the displacement vibration of the capacitor tower in Xinjiang region,a windproof reinforcement measure which can effectively reduce the dis-placement of the capacitor tower is proposed.The simulation results of Midas Gen show that the windproof reinforce-ment measure has a significant effect on reducing the displacement of the capacitor tower,providing a theoretical ba-sis for the design and improvement of the±800 kV DC limit RI capacitor bank under the high seismic zone and strong sandstorm environment conditions in Xinjiang region,and ensuring the safe and reliable operation of UHV engineer-ing equipment.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.70