矮塔斜拉桥大倾角Y型塔柱主动拉杆设计  

Design of Active Pulling Rod for Y-shaped Tower Column with Large Tilt Angle of Short Tower Cable Stayed Bridge

在线阅读下载全文

作  者:富成玮 FU Cheng-wei(China Railway 17th Bureau Group Second Engineering Co.,Ltd.,Xi'an 710024,China)

机构地区:[1]中铁十七局集团第二工程有限公司,西安710024

出  处:《价值工程》2025年第11期117-119,共3页Value Engineering

基  金:中国铁建股份有限公司科技研发计划项目(2023-C12)。

摘  要:斜拉桥钢筋混凝土倾斜塔柱多采用爬模施工过程中,在其自重和施工荷载作用下,因塔柱倾斜对塔底产生的大偏心力矩会导致该部位混凝土拉应力超限,进而引起混凝土开裂、塔顶位移过大等问题,影响桥梁质量和使用寿命。本文以火巷沟(98+2×180+98)m矮塔斜拉桥大倾角Y型上塔柱施工控制为例,对外倾塔柱主动拉杆设置进行了优化设计,结果表明,合理的主动拉杆设置,可有效改善倾斜塔柱施工阶段和成桥后塔柱的应力状态;优化后的主动拉杆施工方法可大幅降低施工安全风险。In the process of climbing formwork construction for the inclined concrete tower columns of the cable-stayed bridge,due to the tilting of the tower column under its own weight and construction load,the large eccentric moment caused by the large lateral force on the base of the tower column will result in excessive tensile stress in the concrete at this location,leading to cracking,excessive displacement of the tower top,and other problems,which will affect the quality and service life of the bridge.Taking the construction control of the(98+2×180+98)m tall-tower cable-stayed bridge with a large inclination angle Y-shaped upper tower column as an example,this paper optimizes the design of the active tie rods for the outward-leaning tower column and the results show that the rational design of the active tie rods can effectively improve the stress state of the inclined tower column during construction and after completion of the bridge;the optimized active tie rod construction method can significantly reduce the construction safety risks.

关 键 词:斜拉桥 塔柱 倾斜 主动拉杆 

分 类 号:U448.27[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象