检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:蔡惠华 王峥 CAI Huihua;WANG Zheng(Nanjing Branch of CCCC Third Harbor Engineering Co.,Ltd.,Nanjing,Jiangsu210000,China)
机构地区:[1]中交第三航务工程局有限公司南京分公司,江苏南京210000
出 处:《施工技术(中英文)》2025年第6期94-99,共6页Construction Technology
摘 要:以阜溧高速公路横泾河特大桥预制立柱一体化安装施工实例为依托,从预制立柱吊装过程中使用的翻转装置和精度控制装置研制,套筒连接接头可靠性研究和安装过程的动态监测及新型套筒灌浆材料研发等方面,开展了预制立柱安装关键技术研究,通过相关技术的研究进一步优化、完善了预制立柱一体化安装工艺,提高了预制立柱一体化安装工艺安装质量,实现了安全高效施工。Based on the integrated installation and construction example of prefabricated column in Hengjing River Bridge of Funing⁃Liyang Expressway,the key technologies of prefabricated column installation are studied from the aspects of the development of the turning device and precision control device used in the hoisting process of prefabricated column,the reliability study of sleeve joint and the dynamic monitoring of the installation process,as well as the research and development of new sleeve grouting materials.Through the research of related technologies,the integrated installation process of prefabricated column is further optimized and improved,which improves the installation quality of the integrated installation process of prefabricated columns and realizes safe and efficient construction.
分 类 号:U445[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.33