检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:彭浩 刘世峰 肖占方 李阳 PENG Hao;LIU Shifeng;XIAO Zhanfang;LI Yang(Hebei Branch,China Nuclear Power Engineering Co.,Ltd.,Shijiazhuang 050000,China)
机构地区:[1]中国核电工程有限公司河北分公司,石家庄050000
出 处:《机械工程师》2025年第4期114-117,共4页Mechanical Engineer
摘 要:热室群对设计的合理性、制造精度、施工逻辑顺序的可实施性都有较高的要求。文中以某大型热室群施工安装过程中出现的典型问题为出发点,对其中的设计、加工制造和施工安装问题的原因、措施进行分析讨论,总结各个过程中可优化的经验,为以后热室设计提供有效的建议和指导。The hot cells have high requirements on the rationality of design,precision of manufacture and the feasibility of logical sequence of construction.Based on the typical problems in the construction and installation of large hot cells,this paper analyzes the reasons and measures of design,manufacture and installation,summarizes the experiences that can be optimized in each process,providing effective suggestions and guidance for the design of hot cells in the future.
分 类 号:TL292[核科学技术—核燃料循环与材料]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7