GSM-R系统BSC/PCU设备以Gb over IP方式接入核心网方案优化  

Optimization for Connecting BSC/PCU Equipment in GSM-R System to Core Network through Gb over IP

在线阅读下载全文

作  者:田晓丹 李颖 周崇伟 李随强 TIAN Xiaodan;LI Ying;ZHOU Chongwei;LI Suiqiang(Hohhot Communication Depot,China Railway Hohhot Group Co.,Ltd.,Hohhot Inner Mongolia 010050,China)

机构地区:[1]中国铁路呼和浩特局集团有限公司呼和浩特通信段,内蒙古呼和浩特010050

出  处:《铁路技术创新》2025年第1期120-125,共6页Railway Technical Innovation

摘  要:随着通信技术的不断发展,基于IP的Gb数据传输(简称Gb over IP)成为GSM-R网络的研究焦点。重点围绕GSM-R系统中BSC/PCU设备以Gb over IP方式接入核心网的方案开展研究,针对BSC/PCU与核心网设备异地设置时,BSC侧无法感知跨传输系统后链路中断,导致保护倒换机制未触发引起业务中断的问题,提出3种解决方案,并进行方案比选与优化,为GSM-R系统BSC/PCU设备以Gb over IP方式对接核心网方案提供操作指导及优化建议,以满足铁路移动通信系统多场景下的组网需求。With the continuous advancement of communication technology,Gb data transmission based on IP(“Gb over IP”)has become a focal point of research in GSM-R networks.This study focuses on solutions for the connection of BSC/PCU equipment in the GSM-R system with the core network via Gb over IP.When BSC/PCU and core network equipment are deployed in different locations,the BSC may fail to detect link interruptions.This results in the protective switching mechanism not being triggered,leading to service disruptions.Therefore,the paper proposes three solutions.Based on a comparison and optimization of the solutions,the paper provides operational guidance and optimization recommendations for the connection of BSC/PCU equipment in the GSM-R system with the core network through Gb over IP,aiming to fulfill the networking requirements of railway mobile communication systems across various scenarios.

关 键 词:GSM-R Gb over IP BSC PCU 核心网 网络优化 

分 类 号:U285[交通运输工程—交通信息工程及控制]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象