检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:董陆洋 DONG Luyang(Shandong Province Industrial Equipment Installation Group Co.,Ltd.,Jinan 250013,Shandong,China)
机构地区:[1]山东省工业设备安装集团有限公司,山东济南250013
出 处:《光源与照明》2025年第3期251-253,共3页Lamps & Lighting
摘 要:为解决电力工程施工中高压输电线路、变电站、电缆敷设和智能化系统建设的技术难点,文章分析了电力工程施工的特点、电力工程施工中的主要技术难点,针对性地提出了一系列具体应对措施,并重点指出了技术创新在电力工程施工中的作用,以期为电力工程施工相关人员在应对复杂工况和技术挑战时提供可行性参考,推动行业技术创新和项目实施的高效化、绿色化发展。In order to solve the technical difficulties in the construction of high-voltage transmission lines,substations,cable laying and intelligent system in power engineering construction,this paper analyzes the characteristics of power engineering construction and the main technical difficulties in power engineering construction,and puts forward a series of specific countermeasures,and points out the role of technological innovation in power engineering construction,in order to provide feasible references for relevant personnel of power engineering construction in dealing with complex working conditions and technical challenges,and promote the efficient and green development of industry's technological innovation and project implementation.
分 类 号:TM73[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28