检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:魏雅康 邱俊霖 吴邵强 Wei Yakang;Qiu Junlin;Wu Shaoqiang(CCCC-FHDI Engineering Co.,Ltd.,Guangzhou Guangdong 510230,China)
机构地区:[1]中交第四航务工程勘察设计院有限公司,广东广州510230
出 处:《港口航道与近海工程》2025年第2期10-13,18,共5页Port,Waterway and Offshore Engineering
摘 要:依托某散货港口项目的库场部分,利用两种传统计算方法与BIM三维建模技术分别计算库场的实际堆存容量,进行比较得出传统计算方法的计算误差与BIM技术的精细化优势。阐述BIM设计过程,并依托三维建模结果对二维设计进行优化,为散货项目的库场容量计算与设计提供新思路,以弥补传统计算与设计方法的不足。Based on the storage yard of a bulk cargo terminal,two conventional calculation methods and BIM 3D modeling technology were used to calculate the real capacity of the storage yard respectively,which led to the errors of the conventional methods and the high accuracy of BIM technology,showed BIM design process.The 3D modeling results applied to the optimization of 2D design,provided new ideas for the calculation and design of the storage capacity of bulk cargo projects,and overcame the shortcomings of the traditional calculation and design methods.
分 类 号:U653.7[交通运输工程—港口、海岸及近海工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.33