检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘波 LIU Bo(SHANGHAI CONSTRUCTION NO.1(GROUP)CO.,LTD.,Shanghai 201100)
出 处:《中国科技纵横》2025年第3期110-112,共3页China Science & Technology Overview
摘 要:随着生产生活领域水资源需求的日渐增加,有关部门需做好水资源管理,按需调配水资源,并采取多种措施提高水质。就当前的情况来看,个别地区对初期雨水处理不当,造成水资源浪费。为解决此类问题,有关部门需要建立排水泵站初雨调蓄池,合理应用顶管施工工艺。基于此,本文以某城市排水泵站初雨调蓄池为例,重点介绍了本项目中的顶管施工要点,以期为同类型项目提供技术参考与借鉴。With the increasing demand for water resources in the field of production and living,the relevant departments need to do a good job in water resources management,allocate water resources on demand,and take various measures to improve the water quality.In the current situation,the improper treatment of the initial rainwater in some areas has seriously threatened the water environment.In order to solve such problems,the relevant departments should establish the initial rainwater storage tank of the drainage pump station and rationally apply the construction technology of pipe jacking.Based on this,this paper takes the initial rainwater storage tank of an urban drainage pump station as an example,and mainly introduces the key points of pipe jacking construction in this project,in order to provide technical reference and reference for the same type of projects.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7