检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王攀[1] 张洁[1] 王文文 WANG Pan;ZHANG Jie;WANG Wenwen(CCCC First Highway Survey and Design Institute Co.,Ltd.,Xi'an 710068,China)
机构地区:[1]中交第一公路勘察设计研究院有限公司,西安710068
出 处:《路基工程》2025年第2期96-101,共6页Subgrade Engineering
摘 要:以某在建饱和黄土地区高速公路工程为依托,通过现场实测,分析计算粒料桩复合地基桩土应力比的变化规律。结果表明:桩土应力比的大小与桩间土的强度有关,桩间土的强度愈大,桩土应力比愈小;路堤填筑过程中应力分担比受填筑时间和填土速度的影响;用粒料桩复合地基对饱和黄土地区软弱土地基进行处治合理有效,建议桩土应力比采用1.80。Based on a highway project in saturated loess area under construction,the change rule of pile-soil stress ratio of granular pile composite foundation is analyzed and calculated through on-site measurement.The results show that:the size of pile-soil stress ratio is related to the strength of the soil between the piles,the greater the strength of the soil between the piles,the smaller the pile-soil stress ratio;embankment filling process stress sharing ratio is affected by the filling time and filling speed;granular pile composite foundation on saturated loess area soft ground treatment is reasonable and effective,it is recommended that the pile-soil stress ratio is 1.80.
关 键 词:饱和黄土 复合地基 现场试验 填土荷载 桩土应力比 数据分析
分 类 号:U412[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.130