作 者:彭承星 郭鸿鹅 吕佳军 王记 陈庆明 PENG Chengxing;GUO Honge;LYU Jiajun;WANG Ji;CHEN Qingming(Ruilijiang I Hydropower Station,Kunming 650000,China)
出 处:《云南水力发电》2025年第4期179-181,共3页Yunnan Water Power
摘 要:瑞丽江一级水电站(以下简称“电站”)作为中国第一个“走出去”的大型水电BOT项目,在缅甸国际背景复杂、国内政局动荡,电力系统发展缓慢、网架结构薄弱、电网故障频发和电站缺乏境外运行管理经验的背景下,通过不断摸索和实践,就电站运行期间的各种内外部风险进行了必要的分析,并针对问题阐述了应对措施。Ruilijiang First level Hydropower Station(referred to as the"Power Station")is the first large-scale hydropower BOT project in China to"go global".Against the backdrop of complex international background,turbulent domestic political situation,slow development of power system,weak grid structure,frequent power grid failures,and lack of overseas operation and management experience of power stations in Myanmar,necessary analysis has been conducted on various internal and external risks during the operation of power stations through continuous exploration and practice,and corresponding measures have been elaborated to address the problems.
分 类 号:TV737[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222