人工湿地组合工艺处理城市污水尾水及初期雨水的应用研究  

Application research on treatment of urban sewage tail water and initial rainwater by artificial wetland combined process

在线阅读下载全文

作  者:肖伟 郭小伟 李娜 刘少杰 张凤英 王敦球[2,3] 徐宇峰 XIAO Wei;GUO Xiaowei;LI Na;LIU Shaojie;ZHANG Fengying;WANG Dunqiu;XU Yufeng(Love Soil Engineering Environmental Technology Co.,Ltd.,Beijing 100025,China;Guangxi Key Laboratory of Environmental Pollution Control Theory and Technology,University of Guangxi,Guilin University of Technology,Guilin 541006,China;Engineering Research Center of Watershed Protection and Green Development,University of Guangxi,Guilin University of Technology,Guilin 541006,China)

机构地区:[1]爱土工程环境科技有限公司,北京100025 [2]桂林理工大学广西环境污染控制理论与技术重点实验室,广西桂林541006 [3]桂林理工大学流域保护与绿色发展广西高校工程研究中心,广西桂林541006

出  处:《工业用水与废水》2025年第2期67-73,共7页Industrial Water & Wastewater

基  金:国家自然科学基金(52260019,52260023);广西科技厅自然科学基金(AD21220132);广西重点研发计划(桂科AB24999030)。

摘  要:基于倒水河冯集断面修复工程项目,探讨了生态沟渠、二级塘与人工湿地组合工艺在污水处理厂尾水和初期雨水深度处理中的应用效果。研究结果表明,该组合工艺对COD_(Cr)、NH_(4)^(+)-N、TP和TN的平均去除率分别为68.88%、85.37%、79.29%和47.73%,出水水质满足GB 3838—2002《地表水环境质量标准》中的Ⅳ类标准,且运行稳定可靠。经济分析显示,该工艺的单位投资为600元/m^(3),直接运行成本为0.19元/m^(3),表明其在较低的投资和成本下能够有效提高尾水水质。该项目的实施为类似工程提供了宝贵的技术经验和参考。Based on the restoration engineering project of Fengji section of Daoshui River,the application effect of the combined process of ecological ditches,secondary ponds,and artificial wetlands in the deep treatment of tail water from sewage treatment plant and initial rainwater were discussed.The research results showed that,the average removal rates of COD_(Cr),NH_(4)^(+)-N,TP,and TN by this combined process were 68.88%,85.37%,79.29%,and 47.73%respectively.The effluent water quality met the Class IV standard of GB 3838—2002 Environmental Quality Standards for Surface Water,and the operation was stable and reliable.The economic analysis showed that the investment of this process was 600 yuan/m^(3),and the direct operating cost was 0.19 yuan/m^(3),indicating that it can effectively improve the quality of tail water at a lower investment and cost.The implementation of this project has provided valuable technical experience and reference for similar projects.

关 键 词:河流考核断面 污水处理厂尾水 初期雨水 生态沟渠 二级塘 人工湿地 

分 类 号:X703.1[环境科学与工程—环境工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象